Kickout Flashing Guide: Code Rules, Materials and DIY Retrofit

kickout flashing at the eave where a shingle roof meets a sidewall
Facebook
Pinterest
Twitter

Kickout flashing is a roof flashing component that diverts rainwater away from a sidewall and into the gutter at the point where a sloped roof eave meets a vertical wall. Without kickout flashing, water runs behind the siding and rots the wall sheathing. The rot stays hidden. This guide explains what the code says and which materials hold up, then walks through do-it-yourself (DIY) retrofit steps for existing roofs.

Key Takeaways

  • Kickout flashing is a one-piece angled flashing that diverts roof runoff into the gutter where a sloped roof eave meets a sidewall.
  • Recent editions of the International Residential Code (IRC) require diverter flashing at roof eave and sidewall intersections in Section R903.2.1.
  • Missing kickout flashing lets water soak the wall sheathing behind the siding, which causes hidden rot and mold growth.
  • Homeowners can retrofit kickout flashing on an existing roof by removing nearby siding and the lowest shingles. A full roof tear-off is not needed.
  • Retrofits on stucco, exterior insulation and finish systems, and brick veneer carry the highest risk and are best left to a professional contractor.

What Is Kickout Flashing?

Kickout flashing, also called kick-out flashing or kickout diverter flashing, is a one-piece angled flashing installed at the bottom of a roof-wall intersection. It turns water outward into the gutter instead of letting the water run down the wall. A kickout is the lowest piece in a run of step flashing.

The name comes straight from the shape, since the bottom end of the piece kicks outward and away from the wall at an angle. It has three parts:

  • A vertical leg that runs up the wall behind the siding
  • A horizontal leg that sits on the roof
  • An angled diverter at the bottom that kicks water out and away from the wall

Layer order matters here. That vertical leg sits behind the water-resistive barrier (WRB), which is the housewrap or building paper layer between the siding and the wall sheathing. On US homes built in recent decades, housewrap is the most common WRB.

Builders and inspectors don’t agree on one name. Kick out flashing, kick-out flashing, diverter flashing and kickout diverter flashing all describe this same component, so any of those terms works when you shop or read a report.

Pre-formed kickouts come in aluminum, galvanized steel, copper and molded plastic. Most homeowners skip the bending work and buy one of these ready-made units instead of shaping sheet metal by hand. It’s the easier route.

Where Kickout Flashing Goes on a Roof

Kickout flashing belongs at every spot where the lower edge of a sloped roof ends against a wall that continues below the eave. Look for these common locations:

  • A one-story garage roof that meets a two-story house wall
  • A porch or shed roof tied into a sidewall
  • A dormer whose side wall runs past the roof edge
  • A bump-out or bay addition roofed below the main wall

Some walls stop at the eave and don’t continue below the roof edge. Skip those. Once water leaves the roof at that kind of intersection, it has no wall surface to run down, so no kickout is needed.

Kickout Flashing Diagram Explained

This table lists each layer shown in a typical kickout flashing diagram, from the roof edge to the siding.

ComponentPositionJob
Drip edgeRoof deck edge at the eaveGuides shingle runoff into the gutter
Kickout flashingLowest course at the wallDiverts wall runoff into the gutter
Step flashingEach shingle course above the kickoutSeals shingles against the wall
WRBLapped over the kickout’s vertical legSheds water that gets behind the siding
SidingOutermost wall layerProtects the wall surface

Water must always flow from an upper layer onto the face of a lower layer. Installers call this shingle lapping. Every kickout installation depends on it, because a lower layer sitting on top of an upper one traps water behind the flashing instead of letting it drain off.

Kickout Flashing vs Step Flashing

asphalt shingles lapped above kickout flashing at a roof-wall intersection

Kickout flashing and step flashing work as a team. Step flashing seals each shingle course against the sidewall, and kickout flashing is the final piece at the eave that throws the collected water into the gutter. On its own, step flashing empties all that water onto the base of the wall.

This table compares kickout flashing and step flashing by role, location, quantity and code reference.

FeatureKickout FlashingStep Flashing
RoleDiverts water away from the wallSeals each shingle course to the wall
LocationBottom of the roof-wall intersectionEvery shingle course up the wall
QuantityOne per roof-wall eaveOne per shingle course
ShapeAngled diverter with a closed endL-shaped bent piece
Code ReferenceIRC R903.2.1 in recent editionsIRC R905.2.8.3 in recent editions

Under the IRC sidewall rules for asphalt shingles, base flashing is at least 4 inches (102 mm) high and 4 inches (102 mm) wide. Each step flashing piece overlaps the one below. Water travels down that stack and exits at the bottom.

That bottom exit is where damage starts. Without a kickout, water leaves the last step flashing and lands on the wall right at the eave, storm after storm, with nothing to steer it toward the gutter.

Is Kickout Flashing Required by Code?

Yes, kickout flashing is required by code in recent editions of the International Residential Code (IRC). Section R903.2.1 calls for flashing that diverts water away from the point where the eave of a sloped roof meets a sidewall. Each town enforces its own adopted IRC edition, along with any local amendments.

The International Code Council (ICC) publishes the IRC. Most US states and municipalities adopt one specific edition, sometimes with local changes. So the exact requirement for a given house depends on which code edition and which amendments are in force where that house stands.

Many siding manufacturers also show kickout flashing in their installation instructions. Skip a required detail and you hand the manufacturer grounds to deny a warranty claim on that siding. Check the instructions for your exact product.

Older homes often lack kickouts. They went up before local codes included the requirement, and whether a permitted reroof or residing job now triggers the current rule depends on the jurisdiction. The water damage risk is the same no matter when the house was built.

How to Confirm Your Local Code

  1. Find the building department for your city, township, borough or county.
  2. Ask which IRC edition and local amendments the jurisdiction enforces.
  3. Ask whether roofing or siding repairs at the intersection need a permit.
  4. Read the installation instructions from your shingle and siding manufacturers.
  5. Store the written answers, permits and receipts with your home records.

What Happens Without Kickout Flashing?

Without kickout flashing, roof runoff pours off the last step flashing directly onto the wall and behind the siding. There it soaks the water-resistive barrier, the wall sheathing and the framing. The damage often stays hidden for years because the siding looks dry from the outside.

Siding sheds most rain, but it isn’t waterproof. At a roof-wall intersection, the water that slips behind the siding during every storm collects at the bottom of the wall, right below the eave. It adds up.

Wall sheathing absorbs this water first. Usually that sheathing is oriented strand board (OSB) or plywood, and repeated wetting softens it and rots the framing behind it. Mold then grows inside the wall cavity.

Stucco and exterior insulation and finish systems (EIFS) carry the highest risk. Both are hard to inspect. These claddings hide moisture damage behind a hard surface, so repairs often mean cutting out large sections of wall to reach the rot.

Signs of Hidden Wall Damage

Look below every roof-wall intersection for these warning signs:

  • Dark streaks or stains on the siding below the eave
  • Peeling paint or swollen trim boards near the base of the wall
  • Cracked, stained or bulging stucco under the roof edge
  • Soft or spongy wall areas that give when pressed
  • Water stains on interior walls or window frames below the intersection
  • Musty odors in rooms next to the affected wall

A pin-type moisture meter gives quick readings on wood trim and siding. Stucco is different. Finding hidden damage inside a stucco wall takes invasive moisture testing, carried out by a qualified inspector who knows that cladding.

Do You Need Kickout Flashing with a Gutter?

water dripping from a gutter end below the kickout flashing at a roof eave

Yes, a house with a gutter still needs kickout flashing. The gutter ends at the wall and cannot catch the water that runs down the wall face behind its end cap. A kickout lifts that stream of water off the wall and drops it into the gutter trough, where the downspout carries it away.

A gutter collects water flowing off the shingles at the eave. Wall runoff misses it. The stream running down the vertical face of the sidewall slides past the gutter’s end cap and keeps heading for the base of the wall.

Placement over the gutter matters. The diverter should empty inside the gutter trough, never over the end cap and never onto the ground below the eave.

This table compares common gutter setups at a roof-wall intersection and the fix for each one.

Gutter SetupProblemFix
Gutter ends tight to the wallNone if the kickout empties insideKeep the end cap below the diverter
Gutter ends short of the wallWater misses the troughExtend the gutter to reach the wall
No gutter at the eaveWater splashes the wall baseAdd a gutter below the kickout
End cap blocks the diverterWater spills onto the wallReposition the end cap or kickout

Is Plastic or Metal Kickout Flashing Better?

For most DIY retrofits, one-piece molded plastic kickout flashing is the better choice because it has no seams that can leak. Metal kickouts in aluminum, galvanized steel or copper suit homes that need matching trim colors or a traditional metal finish. Both types work when they’re lapped correctly.

This table compares common kickout flashing materials by seam risk, corrosion behavior and best use.

MaterialSeam RiskCorrosion NotesBest Use
Molded plasticNone, one-piece bodyDoes not corrodeDIY retrofits on most siding
AluminumLeaks if the fold is unsealedAvoid contact with wet mortarPainted trim, vinyl siding
Galvanized steelLeaks if the fold is unsealedCoating wears over timeBudget metal installs
CopperLow if solderedRunoff can stain nearby surfacesHistoric homes, copper roofs

Never pair copper flashing with aluminum or galvanized steel flashing. The reason is chemistry. When dissimilar metals touch in the presence of water, galvanic action makes the less noble metal corrode faster than it otherwise would.

A metal kickout bent from a single sheet needs sealant or solder at the folded corner. Skip that and the fold leaks. Water drips straight through the diverter and lands back on the wall it was supposed to protect.

Can You Install Kickout Flashing on an Existing Roof?

Yes, you can install kickout flashing on an existing roof without tearing off the roof. Remove the siding and lowest shingles at the eave, slide the kickout under the first step flashing and behind the water-resistive barrier, then rebuild each wall layer in shingle-lap order. A full reroof isn’t needed.

A retrofit takes more care than new construction, because every layer is already in place. Order still rules. The kickout has to end up under the lowest step flashing and under the WRB, so you’ll open both the wall and the roof edge at the intersection.

Expect to work from a ladder at the eave, and from the roof itself on taller walls. Set the ladder on firm, level ground. Second-story eaves and steep roofs call for a professional, as does any job that needs fall protection you don’t own.

Tools and Materials You Need

Gather these items before starting the retrofit:

  • Pre-formed kickout flashing in plastic or sealed metal
  • Replacement step flashing in a matching material
  • Roofing nails
  • Flat pry bar and hammer
  • Siding removal tool (zip tool) for vinyl siding
  • Utility knife and tin snips
  • Flashing tape rated for your WRB
  • Asphalt roofing sealant
  • Ladder, work gloves and fall protection for roof work
  • Garden hose for water testing

Home centers such as The Home Depot and Lowe’s carry step flashing and roofing sealant. Pre-formed kickouts are hit or miss. Availability varies by store, so check stock before you open the wall and find yourself waiting on a part.

How to DIY Kickout Flashing Step by Step

roofer installing shingles and kickout flashing on an existing roof

Follow these steps to install kickout flashing on an existing roof with vinyl, wood lap or fiber cement siding:

  1. Choose a dry, mild day so the shingles bend without cracking and the sealant cures properly.
  2. Remove the siding at the bottom of the roof-wall intersection, high enough to expose the lowest two or three pieces of step flashing.
  3. Cut a horizontal slit in the housewrap above the lowest step flashing. Leave the material attached above the cut.
  4. Break the seal strips on the lowest shingles next to the wall with a flat pry bar, then lift those shingles gently.
  5. Pull the nails from the lowest piece of step flashing and remove it.
  6. Slide the kickout flashing into place at the eave. Tuck its horizontal leg under the lowest shingle at the wall and set its vertical leg flat against the wall sheathing.
  7. Position the diverter so it sticks out past the face of the siding and empties into the gutter trough.
  8. Fasten the kickout following the manufacturer’s instructions. Place the nails where the next step flashing or the WRB will cover them.
  9. Reinstall the step flashing above so it laps over the top of the kickout.
  10. Lap the WRB down over the kickout’s vertical leg, and tape the horizontal slit with flashing tape. Leave the bottom edge of the WRB untaped so it can drain.
  11. Press the lifted shingles back down and seal them with dabs of asphalt roofing sealant.
  12. Reinstall the siding, keeping the gap above the roof surface that the siding manufacturer specifies.
  13. Run a garden hose on the roof above the intersection and confirm that the water exits the diverter into the gutter.

Retrofit Method by Siding Type

This table compares DIY difficulty and the retrofit approach for common US siding types.

Siding TypeDIY DifficultyRetrofit Approach
VinylLowRelease panels with a zip tool, then rehang them
Wood lapModeratePry boards carefully, replace any split boards
Fiber cementModeratePull nails, handle boards gently to prevent cracks
Brick veneerHighPro installs the kickout and counterflashing
Stucco and EIFSHighPro cuts the cladding and patches the finish

Cutting fiber cement releases silica dust. Use tools and dust control methods rated for fiber cement, and wear a properly fitted respirator the whole time you’re cutting.

Brick veneer adds counterflashing. That’s a second layer of flashing set into a mortar joint, where it covers the top edge of the step flashing below it. Cutting those mortar joints without damaging the brick takes masonry skill.

A stucco or EIFS retrofit starts with cutting back the cladding so the kickout can go in behind the WRB. Then the finish gets patched to match. A poor patch creates a new leak path, so these claddings belong with experienced contractors.

How Much Does Kickout Flashing Cost?

No verified figure is available for the typical cost of kickout flashing parts or professional installation. Prices change with material, siding type, wall height, hidden damage and local labor rates. Get several written quotes before hiring a contractor, and compare what each quote includes.

This table compares the factors that move the cost of a kickout flashing project up or down.

Cost FactorLower CostHigher Cost
MaterialPlastic or aluminumCopper
Siding typeVinylStucco, EIFS or brick
AccessOne-story eaveSecond-story or steep roof
Hidden damageDry, solid sheathingRotted sheathing or framing
LaborDIYRoofer plus siding contractor

DIY saves on labor, not risk. One wrong lap order traps water against the wall and turns a small repair into a wall rebuild that costs far more than the kickout ever would have.

Ask for 3 written quotes that each list materials, siding removal, an allowance for sheathing repair, and cleanup. Then compare line by line.

Can a Home Inspector Flag Missing Kickout Flashing?

Yes, home inspectors commonly flag missing kickout flashing as a home inspection defect because it creates a water intrusion risk where a roof eave meets a sidewall. The report usually recommends evaluation and correction by a qualified roofing contractor.

Reports phrase it differently. Some say “missing kickout flashing” or “missing diverter flashing,” while others use the broader “improper roof-to-wall flashing” to describe the same defect.

Buyers who spot this item should ask for further evaluation of the wall below the intersection. Here’s why. A visual inspection can’t see sheathing damage behind the siding, so moisture testing gives a clearer picture of what’s happening inside the wall.

Sellers can install kickouts before listing or negotiate a credit with the buyer. Paperwork helps. Photos of the open wall, kept alongside the repair receipts, show buyers that the sheathing was checked.

DIY or Hire a Pro in Lititz, Pennsylvania

Homeowners researching how to DIY kickout flashing in Lititz, Pennsylvania follow the same retrofit steps used anywhere in the US. They should first confirm permit rules locally, because Pennsylvania enforces construction codes statewide through the Uniform Construction Code (UCC). The UCC adopts ICC codes, including the IRC, for residential work.

Lititz is a borough in Lancaster County. Before opening a wall, call the borough office and find out exactly who handles residential permits and inspections for this kind of repair.

Snow and ice reach south-central Pennsylvania in winter. Freeze-thaw cycles follow. Snowmelt runs down roof-wall intersections for days after a storm, so a working kickout protects the wall in winter as well as during summer rain.

Hire a local roofer or siding contractor for stucco, brick veneer, second-story eaves, or any wall with soft sheathing. Check credentials too. Pennsylvania requires home improvement contractors to register with the Office of Attorney General under the Home Improvement Consumer Protection Act, so ask every contractor for a registration number.

Frequently Asked Questions

Does Kickout Flashing Go Under or over Step Flashing?

Kickout flashing goes under the step flashing. It’s the first piece installed at the eave, and the lowest step flashing then laps over its top edge so water flows down and out.

Does Metal Kickout Flashing Need Painting?

No, metal kickouts perform fine without paint. Only paint aluminum or galvanized units to match trim, and use a primer made for that specific metal so the finish holds.

What If the Gutter Ends Short of the Wall?

Extend the gutter so its end cap sits close to the wall. A short gutter defeats the kickout. The diverter must empty inside the trough, or runoff still lands at the base of the wall below the eave.

Should a Seller Fix Missing Kickout Flashing Before Closing?

Yes, a pre-closing repair removes a common buyer objection and documents the condition of the sheathing behind the siding. Credits work too. A price credit makes sense when the buyer wants to choose the contractor.

Can Caulk Replace Kickout Flashing?

No, caulk isn’t a substitute. Sealant breaks down under sun exposure and building movement, and even a fresh bead of caulk can’t redirect a steady stream of roof runoff away from the wall.

Conclusion

Kickout flashing is a small part. It protects the most leak-prone corner of a house, and as more inspectors photograph roof-wall intersections and more jurisdictions adopt newer IRC editions, homes without kickouts will draw closer scrutiny at sale.

This season, check every spot on your house where a roof eave meets a sidewall. Fix any missing diverter with a one-piece kickout and correct shingle lapping. Tall walls belong with a pro. So do stucco and brick veneer. Afterward, a garden-hose test confirms that the water ends up in the gutter and not inside the wall.

Priya Chandrasekaran

Priya Chandrasekaran leads roofing content at RainyRoofers, covering sustainable, commercial, and residential roofing. She holds an M.S. in Sustainable Building Systems from UC Berkeley, is a LEED AP BD+C, and has 10 years of experience consulting on commercial roofing for institutional clients across California and the Pacific Northwest. She authors RainyRoofers’ recycled metal roofing, roofing materials, and LEED credits content and consults for the US Green Building Council (USGBC).